SIX7 Plumbing Waterproofing Colombo
Bathroom floors, roofs, balconies: prep, prime, coat, cure. Grout and tile-level sealing we do in-house; chemical injection and specialist membrane systems are quoted per m² and delivered to our spec.
MEMBRANE APPLICATION & TESTING
Quoted per m²
+ visit LKR 2,500 — Pay after approval
T&Cs apply — /pricing/ & /disclaimer/
Is this your problem?
- Bathroom floor leaking to the ceiling below
- Balcony ponding into the wall
- Roof slab seeping after rain
- Old grout lines weeping
Waterproofing fails at preparation, not at the product. Old grout, dust, trapped moisture and unfilled cracks turn expensive membranes into expensive paint. Our scope starts with stripping and prepping the surface, then the system: membrane or cementitious coat for slabs and balconies, tile-level regrouting and sealing for bathrooms where the substrate is sound.
Where the problem is structural — water moving through a slab from the other side — chemical injection systems are the right tool, and we quote them per m² with the cure schedule stated up front. Multi-visit by nature; the quote says how many visits and why.
"Any paint can waterproof a surface."
Waterproofing membranes are engineered products — paint is cosmetic, not structural.
Balcony and bathroom waterproofing are the two most common jobs — both fail at the edges, not the center.
Cause
Skipping surface prep, using wrong membrane for the area, and poor application cause most waterproofing failures.
How We Fix It
Surface prep, correct membrane selection, proper application, flood test after curing.
If your bathroom floor feels soft or spongy, the waterproofing may have failed. Get it checked before the tiles crack.
Failed waterproofing damages ceilings, walls, and structural elements. Every month you wait adds to the repair cost.
A flood test after the membrane sets is not optional — twenty-four hours of standing water proves what eyes cannot.
What to Do Before We Arrive
- Stop using the shower or balcony until we look — a dry substrate tells us far more than a wet one.
- Clear bottles, mats and furniture so the whole surface can be inspected.
- Note where water appears relative to the wet area — leaks travel sideways before they drop.
- If tiling is scheduled, tell us now — membrane work happens before tiles, never after.
Request a Quote
Fill out the form below and we'll get back to you within 24 hours.
SIX7 PLUMBING